JB Well Solutions is located at Bryne, Norway (a 20 min drive from Stavanger Airport) and Inverurie, Scotland (a 20 min drive from Aberdeen Airport). These two locations gives us possibility to service Customers on shorter notice and closer to the operations.

JBWS Bryne facility:
With a building mass of 2200m², the workshop and facilities are well fitted for manufacturing and service, while our large outside storage areas offer easy access for loading and testing.

  • JB FacilitiesMain office facilities for all companies in JB Group.
  • Large fabrication and service workshop.
  • Large welding workshop.
  • DNV Nemko Prosafe certified EX equipment workshop.
  • 2 x 10 tonnes SWL overhead cranes.
  • 25 tonnes SWL fork lift capacity.
  • Large outside area for testing and storage of equipment.
  • Miscellaneous test equipment.
  • Goods receipt and storage facilities.

 

JBWS Inverurie facility:
Building mass of 1200m², the workshop and facilities are well fitted for manufacturing and service, large outside storage areas offer easy access for loading and testing. Access via gate and short way to A96.

  • JBWS Facility UKOffice facilities for JB Well Solutions Ltd.
  • Large fabrication and service workshop.
  • 1 x 6.3 tonnes SWL overhead crane.
  • 28 tonnes SWL fork lift capacity.
  • Large outside area for testing and storage of equipment.
  • Miscellaneous test equipment.
  • Goods receipt and storage facilities.
  • Fenced and gated.